Works starts on camera installation project

Motorists on Matakana Road will be keeping to the speed limit from next March onwards, or face the consequences.

Auckland Transport (AT) is in the process of constructing the foundations, bases, power and communications for two speed cameras on the road – one at 297 Matakana Road, just after the Te Honohono ki Tai Road roundabout, and the other at 789 Matakana Road, between Oak River Drive and Wright Road.

In a letter to residents, AT says installation of the poles and cameras will occur later, with the cameras expected to be operational after March next year.AT says the project sup...

Please enter your email to continue reading for free

The Loop
Product Name
This field is for validation purposes and should be left unchanged.

By continuing you agree to our Terms of Use and Privacy Policy