One of the projects largest tip sites was contoured and progressively grassed. The largest cut on the alignment is just before Perry Road with a 70m high rock face - 1.2 million cubic metres was removed from the cut. A total of 800,000 cubic metres of this was used as fill. Environmental management has been an integral part of the Ara Tūhono – Pūhoi to Warkworth motorway project from the start. The 18.5km route over steep hills and flat country, much of it unstable, is estimated to have produced up to 10 million cubic metres* of cut material including rock and soil, which was moved by a combin...
Please enter your email to continue reading for free
That login link has expired. Enter your email below and we’ll send you a new one.
Check your email
Welcome back! We’ve emailed a login link to .
Click the button in that email to log in. There’s no password needed.
It can take a minute to arrive. Check your junk or spam folder if you can’t see it.
Log in with your password
Reset your password
Enter your email and we’ll send you a link to set a new password.
Check your inbox. If there’s an account for that email, we’ve sent a link to reset your password.
You’re in
We’ve created your free account and you’re logged in.
We’ve also emailed you a link to set a password for your account.
By continuing you agree to our Terms of Use and Privacy Policy
