Waterfall roadworks proceed without ecological risk report

The road has been widened up to nine metres, with a new Redi-Rock retaining wall and three-metre wide culvert replacing the one-metre wide culvert. Vicki Brits on her Matakana Valley Road property just below AT road works being carried out by Downer at ‘waterfall corner’. The waterfall on Matakana Valley Road before slip repair work. The waterfall on Matakana Valley Road after slip repair work. Residents on Matakana Valley Road are angry at Auckland Transport (AT) for not carrying out an ecological assessment before slip repair work began on a section of road known as ‘waterfall corner’ in Wha...

Please enter your email to continue reading for free

The Loop
Product Name
This field is for validation purposes and should be left unchanged.

By continuing you agree to our Terms of Use and Privacy Policy